Moving and Installing the Solid Waste System at CEPT Campus…

Today we unpacked the shipping crate containing the solid waste system. All materials were moved by camel cart from the warehouse to the CEPT campus site where the prototype currently resides.

Here are pictures from the move and the installation.

Leave a Reply

Your email address will not be published. Required fields are marked *